Deliverables

Deliverables

Number Name Work package number
D1.1 Report of operational conditions for a high-quality RO permeate and guidelines for the design of highly durable water electrolysers WP1 UPORTO
D1.2 Report of the O3 technology for NF/RO retentate treatment WP1 UPORTO
D1.3 Report with an integrated approach to link WWTPs with H2 energy production by PEM electrolysis WP1 UPORTO
D2.1 Experimental protocols WP2 UNIBAS
D2.2 Report on the most efficient natural-base material as adsorbent for chemical pollution WP2 UNIBAS
D2.3 Report on the optimal conditions generated by the model WP2 UNIBAS
D3.1 Report on brush-modified polyZI RO membrane WP3 BGU
D3.2 Report on HC activation and N/P adsorption-desorption WP3 BGU
D3.3 Report on high recovery effluent desalination WP3 BGU
D3.4 Report on AHC application as a soil amendment/fertilisation by the planter experiment WP3 BGU
D4.1 Evaluation of the greywater for lettuce and the selected crop production WP4 ICRA
D4.2 Human health risk assessment of lettuce and the selected crop with greywater irrigation (with and/or without the grey technology pre-treatment) WP4 ICRA
D5.1 Report on the economic analysis returns after the implementation of NEWater practices WP5 SAP
D5.2 Report on the modelling of the implemented processes WP5 SAP
D5.3 Report of the LCA, TEA and S-LCA WP5 SAP
D6.1 Communication and dissemination plan WP6 SAP
D6.2 Project website WP6 SAP
D6.3 Mid-term conference with stakeholders engagement WP6 SAP
D7.1 Project Management Plan WP7 SAP
D7.2 Data management Plan WP7 SAP
D7.3 Quality and Risk Management report WP7 SAP
D7.4 Quality and Risk Management report – update WP7 SAP

Downloads

Deliverable 6.1 – Communication and dissemination plan
Deliverable 6.3 – Mid-term conference with stakeholders engagement
Deliverable 7.1 – Project management plan
Deliverable 7.2 – Data management plan
Deliverable 7.3 – Quality and Risk Management report

Scroll to Top